A34 TRUNK ROAD (HAMPSHIRE, OXFORDSHIRE AND BERKSHIRE) TEMPORARY TRAFFIC RESTRICTIONS
Notice ID: MF0268347
A34 TRUNK ROAD (HAMPSHIRE, OXFORDSHIRE AND BERKSHIRE) TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited intends
to make an Order on the A34 Trunk Road in the Counties of Hampshire
and Oxfordshire, and the Unitary Authority of West Berkshire, under
Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works
are proposed to be executed on the road.
The effect of the Order would be to authorise:-
1. the phased overnight closure of -
(a) the link road connecting the northbound carriageway of the
A34 to the northbound carriageway of the A33 at Kings Worthy
Interchange (A33);
(b) the slip road leading from the southbound carriageway of the A34
at Three Maids Hill (A272/B3420);
(c) the slip road leading from the southbound carriageway of the A34
at Litchfield Interchange;
(d) the slip road leading from the A34 northbound entry slip to Graces
Lane at Chieveley Interchange (M4 Junction 13);
(e) the slip road leading to the southbound carriageway of the A34 at
East Ilsley Interchange;
(f) the slip roads leading to and from the northbound carriageway of
the A34 at West Ilsley Interchange;
(g) the slip roads leading to and from the southbound carriageway of
the A34 at Islip Interchange (B4027);
(h) the slip road leading to the southbound carriageway of the A34 at
Weston-on-the-Green Interchange (B430); and
(i) the slip road leading to the depot from the southbound
carriageway of the A34, north of the M3 Junction 9 roundabout.
2. The 24-hour closure of any layby adjacent to both carriageways of
the A34 between Bullington Cross Interchange (A30/A303)
and Weston-on-the-Green Interchange (B430).
These measures would be in the interests of road safety while
contractors undertake sign works and all associated works.
It is expected that the work would last for approximately 3 months
starting on or after Thursday 26th April 2018. The overnight closures
would take place between 22:00 and 06:00 (maximum period).
The Order would come into force on 24th April 2018 and have
a maximum duration of eighteen months.
Traffic affected by the closures would be diverted via other junctions
of the A34 or using the M3 and A30. The diversion route would vary
depending on the closure in force.
The temporary closures and diversion routes would be clearly indicated
by traffic signs when they are in operation during the works period.
M Taylor, an Official of Highways England Co Ltd. Ref: HE/SE/2018/A34/107
Highways England Company Limited, (Company No. 9346363).
Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,
GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on
0300 123 5000 or info@highwaysengland.co.uk.
http://www.highways.gov.uk
A34 TRUNK ROAD NEAR OXFORD
TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has
made an Order on the A34 Trunk Road in the County of Oxfordshire,
under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because
works are proposed to be executed on the road.
The effect of the Order is to authorise:-
1) the phased overnight closure of –
a) the southbound carriageway of the A34 between Peartree
Interchange (A44) and Marcham Interchange (A415);
b) the northbound carriageway of the A34 between Hinksey Hill
Interchange (A423) and Botley Interchange (A420);
c) all of the slip roads leading to and from the carriageways described
in a) and b) above;
d) all of the side roads at junction with the carriageways described in
a) and b) above; and
e) all of the bus stops adjacent to the carriageways described in a)
and b) above; and
2) the 24-hour closure of all of the lay-bys adjacent to the carriageways
described in 1)a) and b) above.
These measures are in the interests of road safety while contractors
undertake resurfacing, road marking, loops and studs replacement,
and all associated works.
It is expected that the work will last for approximately 4 weeks starting
on or after Monday 9th April 2018. The overnight closures will take place
between 21:00 and 06:00 (maximum period).
The Order will come into force on 7 April 2018 and have a maximum
duration of eighteen months.
Traffic affected by the road closures will be diverted using the A40, A44,
A338, A417, A420, A423, A4130, and A4142. The diversion in operation
will vary according to the closure in force.
The temporary closures and diversion routes will be clearly indicated by
traffic signs when they are in operation during the works period.
M Taylor, an Official of Highways England Co Ltd. Ref: HE/SE/2018/A34/91
Highways England Company Limited, (Company No. 9346363).
Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,
GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on
0300 123 5000 or info@highwaysengland.co.uk.
http://www.highways.gov.uk