Search for more Public Notices in your area
Highways England Company Limited
Traffic

A34 TRUNK ROAD (HAMPSHIRE, OXFORDSHIRE AND BERKSHIRE) TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MF0270639

Notice effective from
13th April 2018 to 13th May 2018

highways england
A34 TRUNK ROAD (HAMPSHIRE, OXFORDSHIRE AND BERKSHIRE) TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an Order on the A34 Trunk Road in the Counties of Hampshire and Oxfordshire, and the Unitary Authority of West Berkshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order will be to authorise:-
1. the phased overnight closure of -
(a) the link road connecting the northbound carriageway of the A34 to the northbound carriageway of the A33 at Kings Worthy Interchange (A33);
(b) the slip road leading from the southbound carriageway of the A34 at Three Maids Hill (A272/B3420);
(c) the slip road leading from the southbound carriageway of the A34 at Litchfield Interchange;
(d) the slip road leading from the A34 northbound entry slip to Graces Lane at Chieveley Interchange (M4 Junction 13);
(e) the slip road leading to the southbound carriageway of the A34 at East Ilsley Interchange;
(f) the slip roads leading to and from the northbound carriageway of the A34 at West Ilsley Interchange;
(g) the slip roads leading to and from the southbound carriageway of the A34 at Islip Interchange (B4027);
(h) the slip road leading to the southbound carriageway of the A34 at Weston-on-the-Green Interchange (B430); and
(i) the slip road leading to the depot from the southbound carriageway of the A34, north of the M3 Junction 9 roundabout.
2. The 24-hour closure of any layby adjacent to both carriageways of the A34 between Bullington Cross Interchange (A30/A303) and Weston-on-the-Green Interchange (B430). These measures will be in the interests of road safety while contractors undertake sign works and all associated works. It is expected that the work will last for approximately 3 months starting on or after Thursday 26th April 2018. The overnight closures will take place between 22:00 and 06:00 (maximum period). The Order will come into force on 24th April 2018 and have a maximum duration of eighteen months.
Traffic affected by the closures will be diverted via other junctions of the A34 or using the M3 and A30. The diversion route will vary depending on the closure in force. The temporary closures and diversion routes will be clearly indicated by traffic signs when they are in operation during the works period.
M Taylor, an Official of Highways England Co Ltd.
Ref: HE/SE/2018/A34/107
Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@highwaysengland.co.uk
http://www.highways.gov.uk

Attachments

MF0270639.pdf Download

Comments

Related notices