M25 MOTORWAY(JUNCTIONS 19 -21A) TEMPORARYTRAFFIC RESTRICTIONS
Notice ID: MF0256367
M25 MOTORWAY(JUNCTIONS 19 -21A) TEMPORARYTRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an Order on the M25 Motorway in the County of Hertfordshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order is, in alternate phases, to:-
1. authorise the overnight closureofboth carriageways of the M25 between Junction 19 (A41) and Junction 21A (A405), and all slip roads leading to and from this length of carriageway;
2. impose an overnight 50 mph speed limit on -
(a) the clockwise carriageway of the M25 between apoint 270 metres east of Chandlers Lane overbridge and apoint 310 metres south of Old House Lane overbridge;
(b) the anti-clockwise carriageway of the M25 between apoint 1000 metres east of Bedmond Road overbridge and a point 300 metres east of Bedmond Road overbridge; and
(c) the slip road leading from the clockwise carriageway of the M25 at Junction 19.
3. impose an overnight 40 mph speed limit on -
(a) the clockwise carriageway of the M25 between apoint 310metres south of Old House Lane overbridge and apoint 300 metres west of Egg Farm Lane overbridge;
(b) the anti-clockwise carriageway of the M25 between apoint 300 metres east of Bedmond Road overbridge and apoint 40 metres south of the Junction 20 northernunderbridge; and
(c) all slip roads leading to and from these lengths of carriageway.
These measures areinthe interests of road safety while contractors undertake Gade Valley Viaduct repairs and maintenance, resurfacing works, joint replacement, bridge maintenance, carriageway and structural inspections, routine maintenance activities, and all associated works. It is expected that the work will last for approximately 18 months starting on or after Monday 29th January 2018. The overnight closures will take place between (maximum period):
Monday-Thursdays 22:00-05:30 Fridays 22:00-06:00
Saturdays 21:00 -08:00
Sundays 22:30 -05:30
The Order will come into force on 27 January 2018 and have a maximum duration of eighteen months. Traffic affected by the closures will be diverted using the M1, A41, A405 and A414. The diversion route will vary depending on the
closure in place. The temporary speed limits, closures and diversion routes will be clearly indicated by traffic signs when they are in operation during the works period. This notice forms an amendment to the previously published notice reference HE/SE/2017/M25/198.
MTaylor, an Official of Highways England Co Ltd. Ref: HE/SE/2018/M25/23 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,GU1 4LZ. A company registered in England and Wales. For enquiries, please contact the Customer Contact Centre on 0300123 5000 or info@highwaysengland.co.uk. http://www.highways.gov.uk