THE BUCKINGHAMSHIRE COUNTY COUNCIL
Notice ID: MF0238590
THE BUCKINGHAMSHIRE COUNTY COUNCIL
The Council has made The Buckinghamshire County Council (Lent Rise Road, Burnham in the Parish of Burnham CP) (Temporary Prohibition of Through Traffic) Order, 2017 which will temporarily prohibit any vehicle from proceeding, except for access, in Lent Rise Road from junction of Hag Hill Lane to junction of Coalmans Way. Alternative route: Lent Rise Road, Bath Road, Huntercombe Lane North and Stomp Road.
The closure is required whilst traffic signal refurbishment works take place commencing on 3 October 2017 between 0930 and 1530. The proposed Order will come into operation on 3 October 2017, as signed, with maximum 18 months duration. Dated 22 September 2017
The Council has made The Buckinghamshire County Council (Church Lane, Wexham in the Parish of Wexham CP) (Temporary Prohibition of Through Traffic) Order, 2017 which willtemporarily prohibit any vehicle fromproceeding, except for access, in Church Lane from junction with Uxbridge Road. Diversion route
1 -Traffic approaching from Slough - Uxbridge Road, Church Lane and Wexham Park Lane. Diversion route
2-Traffic approaching from Denham- Uxbridge Road, A4, B416, Stoke Green, Wexham Park Lane onto Church Lane. The closure is required whilst resurfacing works take place commencing on 2 October 2017 between 22:00 and 06:00. The proposed Order will come into operation on 2 October2017, as signed, with maximum 18 months duration.
Dated 22 September 2017
The Council intends to make The Buckinghamshire County Council (Dorney Wood Road, Burnham in the Parish of Burnham CP) (Temporary Prohibition of Through Traffic) Order, 2017 which will temporarily prohibit any vehicle from proceeding, except for access, in Dorney Wood Road from Dropmore Road to its junction with Longmead Lane. Alternative route: Longmead Lane, Green Lane, Britwell Road, Dropmore Road and Dorney Wood Road. The closure is required whilst surface water drainage works take place commencing on 9 October 2017 between 0800 and 1700. The proposed Order will come into operation on 9 October 2017, as signed, with maximum 18 months duration.
Dated 22 September 2017
The Council intends to make The Buckinghamshire County Council (Uxbridge Road and Billet lane, Wexham in the Parish ofWexham CP) (Temporary Prohibition ofThrough Traffic) Order, 2017 which will temporarily prohibit any vehicle from proceeding, except for access, in Uxbridge Road and Billet Lane from five points/ Wood Lane to a point 812m west. Billet Lane- junction of Uxbridge Road to a point 52m south. Alternative route: Slough Road, Bangors Road North, St John's Road, Rockingham Road, New Windsor Street, Trumper Way, Windsor Street, Cross Street, Cowley Road, High Street, High Road, Cowley Crescent, Falling Lane, Park View Road, Stockley Road, West Drayton Road, Prologis ParkAccess Road, M4 Junction 3 On Slip, M4 J4 Join E, M4 From A408 Roundabout To J4 Roundabout S, M4 Junction 4 On Slip, M4 Junction 4, M4 Junction4 To Junction 3 On Slip, M4 J4 Roundabout, M4 J4 Leave E, M4 Junction4 OffSlip, M4 Junction 4b Off Slip, M4 From J4 Roundabout To A408 Roundabout N, Holloway Lane, M4 Junction 4 To Junction 4b On Slip, M4 Junction 4 To Junction 4b, Hatch Lane, BathRoad, ColnbrookBy- Pass, Colnbrook By Pass, London Road, Tweed Road, A4 M4 Junction 5 Rbt, Sussex Place, Wellington Street, Uxbridge Road, Church Lane and George Green Road. The closure is required whilst water main works take place commencing on 10 October 2017 between 20:00 and 05:00. The proposed Order will come into operation on 10 October2017, assigned, with maximum 18 months duration.
Dated 22 September 2017
The Council intends to make The Buckinghamshire County Council (Grove Road, Burnham in the Parish of Burnham CP) (TemporaryProhibition ofThrough Traffic) Order, 2017 which will temporarily prohibit any vehicle from proceeding, except for access, in Grove Road from outside Burnham Beeches Hotel. Alternative route: Grove Road, Britwell Road, Farnham Lane, Farnham Road, Beaconsfield Road, Kingsway, Green Lane and Hawthorn Lane. The closure is required whilst mains repair works take place commencing on 9 October 2017. The proposed Order will come into operation on 9 October 2017, as signed, with maximum 18 months duration.
Dated 22 September 2017
Buckinghamshire County Council
County Hall , Walton Street , Aylesbury , HP20 1UA
customerservices@buckscc.gov.uk http://www.buckscc.gov.uk/ 0845 370 8090
Comments