Search for more Public Notices in your area
Highways England Company Limited
Traffic

M25 MOTORWAY (BUCKINGHAMSHIRE AND HERTFORDSHIRE) TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MF0229988

Notice effective from
4th August 2017 to 3rd September 2017

highways england
M25 MOTORWAY (BUCKINGHAMSHIRE AND HERTFORDSHIRE) TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an Order on the M25 in the Counties of Hertfordshireand Buckinghamshire, under Section 14(1)(a) of the Road traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order will be to:
a) authorise the phased overnight closure of:

i. the roads leading to and from the clockwise carriageway of the M25 at Junction 17 (A405);

ii. the road leading from the anti-clockwise carriageway of the M25 at Junction 18 (A404);


iii. the roads leading to and from the clockwise carriageway of the M25 at Junction 18 (A404);

iv.the road leading from the clockwise carriageway of the M25 at Junction 19 (A41);


v. the road leading from the anti-clockwise carriageway of the M25 at Junction 20 (A41);


vi. the clockwise carriageway of the M25 between the exit slip road and the entry slip road at Junction 20 (A41); and

vii. the anti-clockwise carriageway of the M25 between the exit slip road and the entry slip road at Junction 20 (A41).

b) impose an overnight 50mph speed restriction on:

i. the anti-clockwise carriageway of the M25 between Junction 21 (M1 Junction 6A) and Junction 15 (M4 Junction 4B);

ii. the clockwise carriageway of the M25 between Junction 16 (M40 Junction 1A) and Junction 20 (A41); and between Junction 16 (M40 Junction 1A) and Junction 20 (A41); and


iii. all slip roads leading to and from the lengths of carriageway described in b) iand ii above.

These measures areinthe interests of road safety while contractors undertake carriageway resurfacing, road markings, studs and loops replacements, bridge maintenance, crack and joint sealing, inlay resurfacing, carriageway and bridge inspections and all associated work. It is expected that the work will last for approximately 13 weeks starting on or after Monday 14th August 2017.
The overnight closures and speed restrictions will take place between the following times (maximum period):
Monday-Thursday nights 22:00-05:30 Friday nights 23:00-06:00
Saturday nights 22:00-06:00
Sunday nights 22:30-05:30

The Order will come into force on 12 August 2017 and have amaximum duration of eighteen months. Traffic affected by the closures will be diverted using the M25, A41 and A404. The temporary closures, speed restrictions and diversion routes will be clearly indicated by traffic signs when they areinoperation during the works period.
MTaylor, an Official of Highways England Co. Ltd. Ref: HE/SE/2017/M25/124 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,GU1 4LZ. Acompany registered in England and Wales.
For enquiries, please contact the Customer
Contact Centreon0300123 5000 or
info@highwaysengland.co.uk. http://www.highways.gov.uk

Attachments

MF0229988.pdf Download

Comments

Related notices