Search for more Public Notices in your area
Highways
Traffic

M25 Motorway

Notice ID: MF0227849

Notice effective from
21st July 2017 to 20th August 2017

M25 MOTORWAY (BUCKINGHAMSHIRE AND HERTFORDSHIRE) TEMPORARYTRAFFIC RESTRICTIONS

Notice is hereby given that Highways England Company Limited intends to make an Order on the M25 in the Counties of Hertfordshire and Buckinghamshire, under Section 14(1)(a) of the Road traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to:

a) authorise the phased overnight closure of:

i) the roads leading to and from the clockwise carriageway of the M25 at Junction 17 (A405);
ii) the road leading from the anti-clockwise carriageway of the M25 at Junction 18 (A404);
iii) the roads leading to and from the clockwise carriageway of the M25 at Junction 18 (A404);
iv) the road leading from the clockwise carriageway of the M25 at Junction 19 (A41);
v) the road leading from the anti-clockwise carriageway of the M25 at Junction 20 (A41);
vi) the clockwise carriageway of the M25 between the exit slip road and the entry slip road at Junction 20 (A41); and
vii) the anti-clockwise carriageway of the M25 between the exit slip road and the entry slip road at Junction 20 (A41).

b) impose an overnight 50mph speed restriction on:

i) theanti-clockwise carriageway of the M25 between Junction 21 (M1 Junction 6A) and Junction 15 (M4 Junction 4B);
ii) the clockwise carriageway of the M25 between Junction 16 (M40 Junction 1A) and Junction 20 (A41); and
iii) all slip roads leading to and from the lengths of carriageway described in b) iand ii above.

These measures would be in the interests of road safety while contractors undertake carriageway resurfacing, road markings, studs and loops replacements, bridge maintenance, crack and joint sealing, inlay resurfacing, carriageway and bridge inspections and all associated work. It is expected that the work would last for approximately 13 weeks starting on or after Monday 14th August 2017.

The overnight closures and speed restrictions would take place between the following times (maximum period):

Monday-Thursday nights 22:00-05:30
Friday nights 23:00-06:00
Saturday nights 22:00-06:00
Sunday nights 22:30-05:30

The Order would come into force on 12 August 2017 and have amaximum duration of eighteen months. Traffic affected by the closures would be diverted using the M25, A41 and A404. The temporary closures, speed restrictions and diversion routes would be clearly indicated by traffic signs when they areinoperation during the works period.
MTaylor, an Official of Highways England Co Ltd. Ref: HE/SE/2017/M25/124 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,GU1 4LZ. Acompany registered in England and Wales. For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@highwaysengland.co.uk http://www.highways.gov.uk

Attachments

MF0227849.pdf Download

Comments

Related notices