Search for more Public Notices in your area
Highways
Traffic

M27, M271 AND M275 MOTORWAYS TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MF0192470

Notice effective from
22nd December 2016 to 21st January 2017

highways england
M27, M271 AND M275 MOTORWAYS TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an order on the M27, M271 and M275 Motorways in the County of Hampshire, and the Unitary Authorities of the City of Portsmouth and the City of Southampton, under section14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road.
The effect of the Order is to authorise the following:
(a) to impose an overnight temporary mandatory 50mph speed restriction

(b) to authorise the phased overnight closures of; and

(c) to authorise hard shoulder running on; lengths of both carriageways of the M27, M271 and M275 motorways and the slip/link roads leading to and from those motorways.
These measures are in the interests of road safety while contractors undertake a 12 month programme of planned cyclical maintenance.
To obtain a copy of the M27, M271 and M275 Cyclical Maintenance Programme, please contact the Customer Contact Centre (details below).
The duration of each closure or restriction will vary depending on the nature of the maintenance work being
undertaken on each occasion. The programme of works will start on or after 1 January 2017. The closures and
restrictions will be in operation overnight between 21:00 and 06:00 (maximum period).
Access to and from premises accessible from, and only from, the lengths of carriageway to be closed will be
permitted.
The Order will come into force from the 1 January 2017 and have a maximum duration of twelve months. During closures above, traffic affected will be diverted via other junctions of the M27, M271, M275, or by using the A27, A3, A3024, A3057, A3090, A31, A33, A334, A335, A336, A35, A36 or the M3. They will vary depending on the closure in place and will be clearly signed.
The temporary mandatory speed restrictions, slip road, link road and carriageway closures and diversion routes will be clearly indicated by traffic signs when they are in operation during the works periods.
M Taylor, an Official of Highways England Co Ltd. Ref: HE/SE/2016/M4/155
Highways England Company Limited, (Company No 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@highwaysengland.co.uk. http://www.highways.gov.uk
A3(M) MOTORWAY
A3 HORNDEAN INTERCHANGE - JUNCTION 5 TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an Order on the A3(M) Motorway in the County of Hampshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road.
The effect of the Order is to authorise the following:
(a) to impose an overnight temporary mandatory 50mph speed restriction on lengths of both carriageways of the A3(M) between Horndean Interchange (A3(M)) and Junction 5 (Broad Marsh Interchange (A27/A2030)).

(b) allow overnight hard shoulder running on the lengths of the Motorway described above in (a); and

(c) to authorise the phased overnight closure of-

(i) lengths of the A3(M) carriageways described in (a) above,

(ii) the slip and link roads leading to and from both carriageways of the A3(M) described in (a) above.

These measures are in the interests of road safety while contractors undertake a 12 month programme of planned cyclical maintenance.
A copy of the A3(M) Cyclical Maintenance Programme is available from the Customer Contact Centre (contact details below).
The duration of each closure or restriction will vary depending on the nature of the maintenance work being undertaken on each occasion. The programme of works will start on or after 1 January 2017. The closures and restrictions will be in operation between 21:00 and 06:00 (maximum period).
The Order will come into force from the 1 January 2017 and have a maximum duration of twelve months.
During closures above, traffic affected will be diverted using other junctions of the A3(M), or the A3, A27, A2030,
B2149, B2150 and B2177. They will vary depending on the closure in place and will be clearly signed.
The temporary mandatory speed restrictions, hard shoulder running, slip road, and carriageway closures and diversion
routes will be clearly indicated by traffic signs when they are in operation during the works periods.
M Taylor, an Official of Highways England Co Ltd.
Ref: HE/SE/2016/A3(M)/158
Highways England Company Limited, (Company No 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@highwaysengland.co.uk. http://www.highways.gov.uk
M3 MOTORWAY
JUNCTION 2 (M25 JUNCTION 12) TO JUNCTION 14 (M27 JUNCTION 4) TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an Order on the M3 Motorway Road in the Counties of Surrey and Hampshire, under section14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order is to authorise the following:
(a) to impose an overnight temporary mandatory 50mph speed restriction on lengths of both carriageways of the M3 between its junction with the M25 at Junction 2 and its junction with the M27 at Junction 14 and;

(b) to authorise the phased overnight closure of -

(i) lengths of the M3 carriageways described in (a) above,

(ii) the slip and link roads leading to and from both carriageways of the M3 described in (a) above.

These measures are in the interests of road safety while contractors undertake a 12 month programme of planned cyclical maintenance.
A copy of the M3 Cyclical Maintenance Programme is available from the Customer Contact Centre (contact details below).
The duration of each closure or restriction will vary depending on the nature of the maintenance work being undertaken on each occasion. The programme of works will start on or after 1 January 2017. The closures and restrictions will be in operation between 21:00 and 06:00 (maximum period).
Access to and from premises accessible from, and only from, the lengths of carriageway to be closed will be permitted.
The Order will come into force from the 1 January 2017 and have a maximum duration of twelve months.
During closures above, traffic affected will be diverted using other junctions of the M3, or the A27, A272, A287, A30,
A303, A308, A3090, A31, A322, A327, A331, A335, A34, B3040, B3041, B3049, B3335, B3349, B3420, M25 or the
M27. They will vary depending on the closure in place and will be clearly signed.
The temporary mandatory speed restrictions, slip road, link road and carriageway closures and diversion routes will be clearly indicated by traffic signs when they are in operation during the works periods.
M Taylor, an Official of Highways England Co Ltd.
Ref: HE/SE/2016/M3/152
Highways England Company Limited, (Company No 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@highwaysengland.co.uk. http://www.highways.gov.uk

Attachments

MF0192470.pdf Download

Comments

Related notices