Search for more Public Notices in your area
Murley Renewable Energy Limited
Licensing

Fivemiletown, Application for a Generation Licence

Notice ID: ENN2600592

Notice effective from
22nd December 2022 to 21st January 2023

APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE 10(1) (A) OF THE ELECTRICITY (Nl) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003
1. Full name of the applicant(s) Murley Renewable Energy Limited

2. Address of the applicant(s), or In the case of a body corporate, the registered or principle office.

Tricor Suite - 4th Floor, 50 Mark Lane, London, EC3R 7QR.
3. Where the applicant is a company, the full names of the current Directors and the company's registered number:

Directors of Murley Renewable Energy Ltd are M Joyce, A M Doherty, A Elliott and R McGuckian. Company Registration No: 12254667
4. Where a holding of 20 per cent, or more of the shares (see Note) of an applicant is held by a body corporate or partnership or an incorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided.

Shares are 75% owned by Murlock Holdings Limited. Tricor Suite, 50 Mark Lane, London, EC3R 7QR.
5. Desired date from which the licence is to take effect:

1st January 2024
6. The number of generating stations intended to be operated under the licence (if granted):

6 turbines
7. A sufficient description specifying the actual or proposed locations of those stations. E.g.: by reference to townlands, local government districts, postal address, etc. Murley Wind Farm in the east and west of the Murley Road, approximately 5km north of Fivemiletown, Co. Fermanagh. The centre of the site is located at Irish Grid Reference 243234E, 352786N.

A sufficient description specifying the actual or proposed locations of those stations. E.g.: by reference to townlands, local government districts, postal address, etc. Murley Wind Farm in the east and west of the Murley Road, approximately 5km north of Fivemiletown, Co. Fermanagh. The centre of the site is located at Irish Grid Reference 243234E, 352786N.
8. A description of how those stations will, in each case, be fuelled or driven:

The stations will be driven by wind.
9. The date when any proposed generating stations are expected to be commissioned: 1st January 2024.

10. The capacity and type of each unit within the generating station (MW):

Six no. wind turbines each with a capacity of 3.6MW. The overall wind farm maximum export capacity (MEC) will be 21.6MW.
11. A statement of the extent (if any) to which the applicant considers it necessary for powers under Schedule 3 (compulsory acquisition of land etc.) and under Schedule 4 (other powers etc.) to the Order to be given through the licence for which he is applying, together with a statement of any specific purposes for which those powers are felt to be necessary.

None
12. Details of any licences held, applied for or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity:

None
Maps illustrating the Site Location and Infrastructure Layout are available for inspection by the public at the Northern Ireland Authority for Utility Regulation (NIAUR), Queens House, 14 Queen St, Belfast BT1 6ED between 10.00am and 4.00pm on any working day.

Attachments

ENN2600592.pdf Download

Comments

Related notices