Search for more Public Notices in your area
Traffic

Haringey, Multiple Traffic Notices

Notice ID: WAT2516461

Notice effective from
21st September 2022 to 21st October 2022

TTM0136 S14(1)

The Haringey (Ashley Road, Burdock Road & Chesnut Road N17) (Temporary Prohibition And Restriction Of Traffic) Order 2022

The Council of the London Borough of Haringey intends to make the Temporary Traffic Order described below under S14(1) Road Traffic Regulation Act 1984:-

Ashley Road N17 East and West (Galliford Try), Burdock Road N17 & Chesnut Road N17


Reason for 14(1) Order  Construction Access for New Building Development (Homes)
Operational Dates and Times
Operational Dates:
29th Sept 2022 -31st Oct 2022
Times inside School Holidays: 24hrs
Times outside School Holidays
Restrictions in force between 07:00 - 09:30
Restrictions in force between 15:30 - 18:00
Restrictions for Loading and Unloading of materials will not be in force during School Holidays on these dates: 14th Oct-31st Oct 2022
onstruction Access for New Building

General Effect of Order
Ashley Road N17
1) Suspension of loading bay, the north-east side, at its junction with Watermead Way;

2) introduction of waiting and loading restrictions with an exemption for HGVs connected with the works, the south-west side at its junction with Watermead Way, 18 metres in length;

3) introduction of waiting and loading restrictions with an exemption for HGVs connected with the works, the north­east side, adjacent to the entrance to Berol Yard, 36 metres in length;

4) introduction of waiting and loading restrictions, both sides, between its junctions with Hale Road and

Burdock Road.
5) road closure between its junctions with Hale Road and Burdock Road;

Burdock Road N17
introduction of waiting and loading restrictions, both sides, between its junctions with Ashley Road and Watermead Way, with an exemption for the bus stand.
Chesnut Road N17
1) Suspension of parking and introduction of no waiting/no loading restrictions between its junction with Hamilton Close and the north-eastern boundary of No. 1 Fairbanks Road.

2) road closure between its junctions with Park View Road and Fairbanks Road;

Operational Dates and Times: 29th Sept 2022 to 30th April 2023
Times outside School Holidays
Restrictions in force between 07:00 - 09:30
Restrictions in force between 15:30 - 18:00
Restrictions will not be in force during School
24th Oct - 28th Oct 2022
19th Dec 22 - 2nd Jan 2023 - 13th Feb - 17th Feb 3rd April - 14th April 2013.
3) banned left and right turns into Park View Road and Fairbanks Road;

4) suspension of parking and introduction of no waiting/no loading restrictions, both sides, between its junction with Park View Road and the north-eastern boundary of No. 1 Fairbanks Road; suspension of parking, with an exemption for loading/unloading by heavy goods vehicles connected with the works, the south-west side, from a point 10 metres south-east of its junction with Fairbanks Road and a point 10 metres north-west of its junction with Park View Road.

Agreed Site Working Arrangements
During the following dates and times:-
Deliveries can be undertaken during school holidays as per agreed timings,
and will be monitored: 06:30 - 07:30 vehicles can enter site.
At all other times outside of school holiday periods the HGV extended
delivery timings should apply:
Deliveries can enter site before 07:00

The provisions of the Order shall apply only at such times and as directed by traffic signs. For road closures, alternative routes will be directed by traffic signs. Access will be maintained where possible. For more information visit our website at

www.haringey.gov.uk/traffic_orders



Date: 21st September 2022 Ann Cunningham, Traffic Management

Attachments

WAT2516461.pdf Download

London Borough of Haringey

Comments

Related notices