Multi Traffic notices, Buckinghamshire County Council
Notice ID: MFN0648642
BUCKINGHAMSHIRE COUNCIL
The Council has made Buckinghamshire Council (Billet Lane, Iver in the Parish of Wexham CP) (Temporary Prohibition of Through Traffic) Order, 2022 which will temporarily prohibit any vehicle from proceeding, except for access, in Billet Lane for approximately 346m. Alternative route: Bellswood Lane, Wood Lane, Langley Park Road, Billet Lane and vice versa. The closure is required whilst Openreach overhead works take place commencing on 7 March 2022. The proposed Order will come into operation on 7 March 2022, as signed, with maximum 18 months duration.
Dated 4 March 2022
The council has made Buckinghamshire Council (Temporary Prohibition of through Traffic) (Various roads, South Bucks) Order, 2022, which will temporarily prohibit any vehicle from proceeding, except for access, in various roads in [South Bucks] as specified in the Schedule below. The closures are required whilst surfacing works take place between [07 March 2022] and [10 June 2022]. The proposed Order will come into operation on 07 March 2022 and will be in effect when signed and between times as per schedule below on the days signed, with a maximum duration of 18 months. SCHEDULE - "AR" = Alternative Route. Uxbridge Road, Wexham from Five Points roundabout to Wexham Park Lane. AR-Church Road, Denham Road, Southlands Road, Denham Roundabout, Oxford Road, London Road, Dorney Hill North, Collinswood Road, Beaconsfield Road, Farnham Road, Bath Road, High Street, Wellington Street, Uxbridge Road and vice versa. Ship Hill, Dorney for the entire length. AR-Dorney Hill North, Collinswood Road, Beaconsfield Road, Kingsway, Hawthorn Lane, Pumpkin Hill, Curriers Lane, Dorney Wood Road and vice versa. Alderbourne Lane, Fulmer for the entire length. AR-Alderbourne Lane, Fulmer Common Road, Windmill Road and vice versa. Church Lane, Wexham for the entire length. AR-Uxbridge Road, George Green Road, Wexham Park Lane and vice versa. Park Road, Farnham Royal for the enitre length. AR-Grays Park Road, Bells Hill, Gerrards Cross Road, Templewood Lane, Beaconsfield Road and vice versa. Gore Road, Burnham for the entire length. AR-Britwell Road, Hogfair Lane, Priory Road, Stomp Road, Huntercombe Lane North, Lent Rise Road, Lent Green and vice versa. PLEASE NOTE: The full duration of this multi-order is to allow coordination of a number of works, and flexibility given their weather dependant nature. The actual times that each road will be closed for will be much less than this and could be either day or night works only. The full details will be publicised on one.network when confirmed, with signs on the affected road erected two weeks before the closure.
Dated 4 March 2022
The Council has made Buckinghamshire Council (Lakes Lane, Beaconsfield in the Parish of Beaconsfield CP) (Temporary Prohibition of Through Traffic) Order, 2022 which will temporarily prohibit any vehicle from proceeding, except for access, in Lakes Lane for 180 metres. Alternative route: Lakes Lane, Hedgerley Lane, Windsor End, Wycombe End, London End, Park Lane and vice versa. The closure is required whilst Main lays in the middle of the road. Road to be closed from 14 March during the hours of 08:00-17:00. Road to be open all other hours. The proposed Order will come into operation on 14th March 2022, as signed, with maximum 18 months duration.
Dated 04 March
The council has made Buckinghamshire Council (Temporary Prohibition of through Traffic) (Various roads, South Bucks) Order, 2022, which will temporarily prohibit any vehicle from proceeding, except for access, in various roads in [South Bucks] as specified in the Schedule below. The closures are required whilst surfacing works take place between [07 March 2022] and [100 June 2022]. The proposed Order will come into operation on 07 March 2022 and will be in effect when signed and between times as per schedule below on the days signed, with a maximum duration of 18 months. SCHEDULE - "AR" = Alternative route North Drive, Beaconsfield for the entire length. AR-Wycombe End. St Francis Road, Denham for the entire length. AR-: Green Tiles Lane, Denham Green Lane, Penn Drive and vice versa. Hitcham Lane, Burnham for the entire length. AR-Hill Farm Road, Boundary Road, Taplow Road, Lent Rise Road and vice versa. Stevenson Road/Jones Way/Cottage Park Road, Hedgerley for the entire lengths. AR-Cottage Park Road, Jones Way, Stevenson Road and vice versa. Rectory Close, Farnham Royal for the entire length. AR-Rectory Close. Black Park Road, Wexham for the entire length. AR-Rowley Lane, Wexham Street, Church Lane, Wexham Park Lane, Uxbridge Road and vice versa. Mayflower Way/Ashenden Walk/Crispin Way, Farnham Common for the entire length. AR-: One Pin Lane, Beaconsfield Road, Templewood Lane and vice versa. Wellesley Avenue, Iver for the entire length. AR-Bathurst Walk, Thorney Lane South, Richings Way and vice versa. Seeleys Road, Knotty Green for the entire length. AR-Penn Road, Forty Green Road and vice versa. Rectory Road, Taplow for the entire length. AR-Hill Farm Road, Cliveden Road and vice versa. Oxford Road, Denham from North Orbital Road to Amersham Road. AR-Oxford Road, London Road, Dorney Hill North, Collinswood Road, Beaconsfield Road, Farnham Road, Bath Road, High Street, Wellington Street, Uxbridge Road, Church Road, Denham Road, Southlands Road, A40, Denham Roundabout and vice versa. PLEASE NOTE: The full duration of this multi-order is to allow coordination of a number of works, and flexibility given their weather dependant nature. The actual times that each road will be closed for will be much less than this and could be either day or night works only. The full details will be publicised on one.network when confirmed, with signs on the affected road erected two weeks before the closure.
Dated 4 March 2022
The Council has made Buckinghamshire Council (Riding Lane, Beaconsfield in the Parish) (Temporary Prohibition of Through Traffic) Order, 2022 which will temporarily prohibit any vehicle from proceeding, except for access, in Riding Lane for roughly 125 metres. Alternative route: Holtspur Top Lane, Wycombe End, White Hill, London Road, Whitehouse Lane, Gatemoor Lane and vice versa. The closure is required whilst gas replacement works, take place commencing on 07 March 2022 between 08:00 and 17:00. The proposed Order will come into operation on 07 March 2022, as signed, with maximum 18 months duration.
Dated 04 March 2022
Buckinghamshire County Council
County Hall , Walton Street , Aylesbury , HP20 1UA
customerservices@buckscc.gov.uk http://www.buckscc.gov.uk/ 0845 370 8090
Comments