Search for more Public Notices in your area
SP ENERGY NETWORKS
Planning

The Clauchrie 132kV Connection Project

Notice ID: GRE2073819

Notice effective from
4th May 2021 to 3rd June 2021

SP ENERGY NETWORKS
The Clauchrie 132kV Connection Project
We'd like your views Public consultation
Overhead line connection from Clauchrie Wind Farm to Mark Hill Substation
SP Energy Networks are seeking comments on a proposed 132kV, wood pole overhead line which would connect Clauchrie Wind Farm to the transmission grid system at Mark Hill substation in South Ayrshire.
This consultation will run for four weeks between 17th May until 14th June 2021.
However, the information will remain accessible online and available to download in a pdf format after the 14th June 2021 from

www.spenergynetworks.co.uk/ClauchrieOHL


Due to current restrictions relating to the Covid-19 pandemic, a virtual, online consultation process is being undertaken, rather than a town hall presentation format. This will allow people to view the project information in a virtual environment and to leave comments on the preferred overhead line route. Hard copies of the Routeing and Consultation Report can be downloaded from the web page above and information leaflets will be distributed locally too. Feedback from this event will then be considered by SP Energy Networks prior to the proposed route being determined.
From 17th May 2021 the virtual consultation and questionnaire can be accessed from this link:

www.ClauchrieOHL.co.uk


Comments can also be sent to the project email address

ClauchrieOHL@spenergynetworks.co.uk


Please note - Comments at this stage are informal and are made to allow SP Energy Networks to determine whether changes to the route are necessary. An opportunity to comment formally to the Energy Consents Unit will follow at a later stage in the process following consultation by the Scottish Government once the application is submitted to them.

Attachments

GRE2073819.pdf Download

Comments

Related notices