Traffic

Essex County Council

Notice ID: MFN0597321

Notice effective from
18th February 2021 to 20th March 2021

Essex County Council
(Back Lane, Nazeing) (Temporary Prohibition of Traffic) Order 2021
Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice, to make the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order: To temporarily close that length of Back Lane, Nazeing in the District of Epping Forest, from its junction with Nazeing Common for a distance of approximately 61 Om in a northerly then northwesterly direction. The closure is scheduled to commence on 10th March 2021 for 1 day, or where stated on a valid permit (BC008WC1MK39Z01 -BT). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on one.network. The closure is required for the safety of the public and workforce while pole replacement works are undertaken by BT. An alternative route is available via Nazeing Common, Betts Lane, Back Lane and vice versa.
The Order will come into effect on 25th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.

(Hoe Lane, Nazeing) (Temporary Prohibition of Traffic) Order 2021
Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice, to make the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order: To temporarily close that length of Hoe Lane, Nazeing in the District of Epping Forest, from its junction with Sunnyside to its junction with Hoe Croft a distance of approximately 55m. The closure is scheduled to commence on 8th March 2021 for 3 days, or where stated on a valid permit (MX04410114859 - Affinity Water). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on one.network. The closure is required for the safety of the public and workforce while stop tap fitting and boundary box installation works are undertaken by Affinity Water. An alternative route is available via Hoe Lane, Betts Lane, Nazeing Common, Waltham Road, Laundry Lane, St Leonards Road and vice versa. The Order will come into effect on 25th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.

(Various Roads, District of Epping Forest) (Temporary Prohibition of Traffic & Clearway) (No.3) Order 2021
Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice to make the above Order under section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order:
To temporarily close the various lengths of road in the District of Epping Forest as specified in the schedule to this Order.
1. A temporary 'No Waiting, No Loading and No Stopping' restriction will be introduced on both sides of carriageway on the above lengths of roads for the duration of the closures to facilitate the works. Signs will be installed indicating when the No Waiting, No Loading and No Stopping restriction will be in force.
2. "The Essex County Council (Epping Forest District) (Prohibition of Waiting, Loading and Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019° will be temporarily amended to include the temporary 'No Waiting, No Loading and No Stopping at Any Time' restriction and suspend any existing parking and waiting restrictions on the above lengths of roads only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works being undertaken will take place within an 18-month period from 25th February 2021, exact dates will be specified on One.network. The roads will be closed to facilitate each phase of works and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
For all enquiries please contact our Contact Centre on 0345 603 7631.
The Order will come into effect on 25th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
(PLEASE DOWNLOAD THE PDF BELOW TO VIEW DETAILS)

(Various Roads, District of Epping Forest) (Temporary Prohibition of Traffic & Clearway) (No.4) Order 2021
Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice to make the above Order under section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order:
1. To temporarily close the various lengths of road in the District of Epping Forest as specified in the schedule to this Order.
2. A temporary 'No Waiting, No Loading and No Stopping' restriction will be introduced on both sides of carriageway on the above lengths of roads for the duration of the closures to facilitate the works. Signs will be installed indicating when the No Waiting, No Loading and No Stopping restriction will be in force.
"The Essex County Council (Epping Forest District) (Prohibition of Waiting, Loading and Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019" will be temporarily amended to include the temporary 'No Waiting, No Loading and No Stopping at Any Time' restriction and suspend any existing parking and waiting restrictions on the above lengths of roads only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works being undertaken will take place within an 18-month period from 25th February 2021, exact dates will be specified on One.network. The roads will be closed to facilitate each phase of works and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
For all enquiries please contact our Contact Centre on 0345 603 7631.
The Order will come into effect on 25th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
(PLEASE DOWNLOAD THE PDF BELOW TO VIEW DETAILS)

(Various Roads, District of Harlow) (Temporary Prohibition of Traffic, Temporary Introduction of a Clearway and Temporary Introduction of 30mph Speed Restriction) (No.1) Order 2021
Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice to make the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order
1. To temporarily close the various lengths of road in the District of Harlow as specified in the schedule to this Order.
2. A temporary 'No Waiting, No Loading and No Stopping' restriction will be introduced on both sides of carriageway on the above lengths of roads for the duration of the closures to facilitate the works. Signs will be installed indicating when the No Waiting restriction will be in force.
3. To temporarily introduce a 30 mph speed restriction in those lengths of road in the schedule.
"The Essex County Council (Harlow District) (Prohibition of Waiting, Loading and Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019" will be temporarily amended to include the temporary 'No Waiting at Any Time' restriction and suspend any existing parking and waiting restrictions on the above lengths of roads only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works being undertaken will take place within an 18-month period from 25th February 2021, exact dates will be specified on http://roadworks.org/. The roads will be closed to facilitate each phase of works and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
For all enquiries please contact our Contact Centre on 0345 603 7631.
The Order will come into effect on 25th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
(PLEASE DOWNLOAD THE PDF BELOW TO VIEW DETAILS)

(Woodbury Hill, Loughton) (Temporary Prohibition of Traffic) Order 2021
Notice is hereby given
that the Essex County Council intends, not less than seven days from the date of this notice, to make the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order To temporarily close that length of Woodbury Hill, Loughton in the District of Epping Forest, from its junction with Kings Hill for a distance of approximately 30m in a northeasterly direction. The closure is scheduled to commence on 8th March 2021 for 5 days, or where stated on a valid permit (AZ7031001006537 - Cadent). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on one.network. The closure is required for the safety of the public and workforce while new connection works are undertaken by Cadent. An alternative route is available via Kings Hill, York Hill, Woodbury Hill and vice versa. The Order will come into effect on 25th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.

(Hoe Lane, Nazeing) (Temporary Prohibition of Traffic) Order 2021
Notice is hereby given
that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order To temporarily close that length of Hoe Lane, Nazeing in the District of Epping Forest, from a point approximately 590m northwest then southwest of its junction with Betts Lane for a distance of approximately 220m in a northwesterly direction. The closure is scheduled to commence on 23rd February 2021 for 4 days, or where stated on a valid permit (MX054290095600 - Affinity Water). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on one.network. The closure is required for the safety of the public and workforce while new connection works are undertaken by Affinity Water.
An alternative route is available via Hoe Lane, Betts Lane, Nazeing Common, Middle Street and vice versa.
The Order came into effect on 11 th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.

(Various Roads, District of Epping Forest) (Temporary Prohibition of Traffic & Clearway & Temporary Introduction of 30mph Speed Limit) (No.2) Order 2021

Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order
1. To temporarily close the various lengths of road in the District of Epping Forest as specified in the schedule to this Order.
2. A temporary 'No Waiting, No Loading and No Stopping" restriction will be introduced on both sides of carriageway on the above lengths of roads for the duration of the closures to facilitate the works. Signs will be installed indicating when the No Waiting, No Loading and No Stopping restriction will be in force.
3. To temporarily introduce a 30mph speed limit in the lengths of road as per the schedule.
"The Essex County Council (Epping Forest District) (Prohibition of Waiting, Loading and Stepping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019" will be temporarily amended to include the temporary 'No Waiting, No Loading and No Stopping at Any Time' restriction and suspend any existing parking and waiting restrictions on the above lengths of roads only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works being undertaken will take place within an 18-month period from 11th February 2021, exact dates will be specified on One.network. The roads will be closed to facilitate each phase of works and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
For all enquiries please contact our Contact Centre on 0345 603 7631.
The Order came into effect on 11th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
Road
A414 Epping Road, Bobbingworth
Description
Talbot Roundabout exit eastbound to the junction with Moreton Road
Alternative Route
Diversion A: Canes Lane Diversion, Canes Lane Roundabout, Canes Lane, Hastingwood Roundabout, London Road, A414 between southern town and Harlow Mill Roundabout, First Avenue, London Road, Gilden Way, Sheering Way, Harlow Road, Sheering Road, The Street, Sheering Road, Chelmsford Road, Stortford Road, Chelmsford Road, Salts Green, Bishop Stortford Road, Roxwell Road, Roxwell Road Roundabout, Rainsford Road, Parkway, Waterhouse Lane, Westway, London Road, Writtie Bypass Roundabout, Greenbury Way, Highwood Road Roundabout, Ongar Road West, Ongar Road, Chelmsford Road Straightening, Chelmsford Road, High Ongar Road and FourWantz Roundabout.
Diversion B: FourWantz Roundabout, High Ongar Road, Chelmsford Road, Chelmsford Road Straightening, Ongar Road, Ongar Road West, Highwood Road Roundabout, Greenbury Way, Writtie Bypass Roundabout, London Road, Westway, Waterhouse Lane, Parkway, Rainsford Road, Roxwell Road Roundabout, Roxwell Road, Bishop Stortford Road, Salts Green, Chelmsford Road, Stortford Road, Chelmsford Road, Sheering Road, The Street, Sheering Road, Harlow Road, Sheering Way, Gilden Way, London Road, First Avenue, A414 between southern town and Harlow Mill Road, London Road, Hastingwood Roundabout, Canes Lane, Canes Lane Roundabout and Canes Lane Diversion

(Various Roads, Epping Forest) (Temporary Prohibition of Traffic & Temporary Introduction of 30 MPH Speed Limit) & (Temporary Introduction of Clearway) (Streetworks No.1) Order 2021
Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order:
1. To temporarily close those various lengths of roads in the District of Epping Forest as detailed in the Schedule.
2. To temporarily introduce a 30mph speed limit in the various lengths of road as detailed in the schedule.
3. A temporary 'No Waiting, No Loading and No Stopping' restriction will be introduced on both sides of carriageway on the various lengths of roads as specified in the schedule for the duration of the restrictions in order to facilitate the works. Signs will be installed indicating when the No Waiting, No Loading and No Stopping restriction will be in force.
4. "The Essex County Council (Epping Forest District) (Prohibition of Waiting, Loading and Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019" will be temporarily amended to include the temporary 'No Waiting, No Loading and No Stopping at Any Time' restriction and suspend any existing parking and waiting restrictions on the above lengths of roads only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works are scheduled to commence after 11th February 2021, as stated on a valid permit. The scheduled dates may vary for these works with appropriate signs showing and/or displayed on One.network. The roads will be closed to facilitate each phase and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
The restrictions are required for the safety of the public and workforce while superfast installation cabling works are undertaken by Gigaclear.
The Order came into effect on 11th February 2021 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
(PLEASE DOWNLOAD THE PDF BELOW TO VIEW DETAILS)

Attachments

MFN0597321.pdf Download

Essex County Council

County Hall , Market Road , Chelmsford , Essex , CM1 1QH

http://www.essex.gov.uk/Pages/Default.aspx 0845 743 0430