Search for more Public Notices in your area
Highways england
Traffic

M3 MOTORWAY (JUNCTIONS 4 TO 6) TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MFN0594398

Notice effective from
28th January 2021 to 27th February 2021

M3 MOTORWAY (JUNCTIONS 4 TO 6) TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited intends to make an Order on the M3 Motorway in the Counties of Surrey and Hampshire, under Sections 14(1 )(a) and 14(7) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise:-
1. the overnight closure of -

(a) the London-bound carriageway of the M3 between Junction 6 (A339) and Junction 5 (A287);

(b) all slip roads leading to and from the first length of carriageway;

(c) the slip road leading to the coast-bound carriageway of the M3 at Junction 4 (A331); and

(d) the slip roads leading to and from the coast-bound carriageway of the M3 at Junction 6 (A339).

2. the 24-hour closure of -

(a) the clockwise carriageway of the M3 Junction 6 roundabout between the London-bound entry slip road and the London-bound exit slip road; and

(b) the slip roads leading to and from the coast-bound carriageway of the M3 at Junction 6 (A339).

3. the suspension of the ban on Heavy Goods vehicles in the outside lane of -

(a) the London-bound carriageway of the M3 between a point 400 metres southwest of the Hackwood Road (A339) underbridge and a point 150 metres east of Greywell Road overbridge; and

(b) the coast-bound carriageway of the M3 between a point 300m west of The Maultway (B3015) overbridge and a point 250m east of Curly Bridge Close Footbridge.

These measures would be in the interests of road safety while contractors undertake resurfacing, road-marking, stud and loop replacement and all associated works.
It is expected that the work would last for approximately 5 weeks starting on or after Monday 22nd February 2021. The overnight closures would take place between 21:00 and 06:00 (maximum period). The Order would come into force on 20th February 2021 and have a maximum duration of eighteen months, ceasing when the works are complete. Traffic affected by the closures would be diverted via other junctions of the M3 and by using the A30 and the A287. The diversion in operation would vary depending on the closure in force.
The temporary closures, outside lane running and diversion routes would be clearly indicated by traffic signs when they are in operation during the works period.
J Downham, an Official of Highways England Co. Ltd. Ref: HE/SE/2021/M3/18
Highways England Company Limited, (Company No. 9346363). Registered
Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ.
A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on
0300 123 5000 or

info@highwaysengland.co.uk

.

https://www.highwaysengland.co.uk


Attachments

MFN0594398.pdf Download

Comments

Related notices