Search for more Public Notices in your area
Highways England Company Limited
Traffic

M271 MOTORWAY AND A33 (REDBRIDGE ROUNDABOUT) TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MF0548328

Notice effective from
12th March 2020 to 11th April 2020

highways
england
M271 MOTORWAY AND A33 (REDBRIDGE ROUNDABOUT) TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited (a) has made the M271 Motorway and A33 (Redbridge Roundabout) (Temporary Restriction and Prohibition of Traffic) Order 2020 in the County of Hampshire and the Unitary Authority of the City of Southampton, under Sections 14(1)(a) and 14(5)(b) of the Road Traffic Regulation Act 1984 because works are in progress on the road. This forms an extension of Temporary Notice HE/2020/E202 as permitted by The Road Traffic (Temporary Restrictions) Procedure Regulations 1992, Section 7. The effect of the Order is, in phases, to:-
1. authorise the overnight closure and 24-hour weekend closure of -

(a) both carriageways of the M271 between Junction 1 (Nursling Interchange) and Redbridge Roundabout (A33/A35), and all slip roads leading to and from this length;

(b) Redbridge Roundabout (M271/A33/A35);

(c) the slip roads leading to and from the A33 at Redbridge Roundabout (M271/A33/A35);

(d) all side roads at junction with Redbridge Roundabout (M271/A33/A35) and the slip roads described in 1. (c) above;

(e) any bus stop adjacent to the slip roads described in 1. (c) above;

(f) the bus lane adjacent to the A33 westbound off slip between its junction with Old Redbridge Road and Redbridge Roundabout; and

(g) the footpaths, pedestrian crossings, footbridges and subways adjacent to 1. (b), (c), and (d) above.

2. impose a 24-hour 50mph speed limit and overtaking ban on -

(a) the M271 southbound between M27 Junction 3 and Redbridge Roundabout (M271/A33/A35); and

(b) the M271 northbound between Redbridge Roundabout (M271/A33/A35) and Junction 1 (Nursling Interchange).

3. impose a 24-hour 30mph speed limit on the roundabout and slip roads described in 1. (b) and (c) above.

4. impose a 24-hour width restriction of 3.25 metres in lanes 1 and 2 in the lengths of carriageway and roundabout described in 1. (a) and (b) above.

5. impose a 24-hour width restriction of 3.0 metres on the slip roads described in 1. (c) above.

These measures are in the interests of road safety while contractors undertake carriageway works, footpath works, footbridge works, subway maintenance, electrical works and all associated works.
The Order came into force on 6th March 2020 for a maximum of six months or until the works are complete, whichever is the sooner. Traffic affected by the closures will be diverted using the A33, A35, A3057 and Brownhill Way. The diversion route will vary depending on direction of travel. Pedestrian diversion routes will be available, including temporary pedestrian crossings. The temporary speed limit, narrow lanes, overtaking ban, closures and diversion routes will be clearly indicated by traffic signs when they are in operation during the works period.
J Downham, an Official of Highways England Co Ltd. Ref: HE/SE/2020/M271/75 (a) Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer
Contact Centre on 0300 123 5000 or

info@highwaysengland.co.uk http://www.highways.gov.uk


Attachments

MF0548328.pdf Download

Comments

Related notices